Tavimi

Tavimi for engineering firms

Every project keeps its assumptions, decisions and actions.

Design assumptions, reviewer comments, replies to the architect, drawing revisions: Tavimi keeps the history of each project. Engineers, drafters and AI assistants work from the same base.

The Tavimi web app is in French for now; an English interface is on its way. Your assistants work in any language.

The “Groupe scolaire de Vertou” space of BET Armature: calculations, reports, drawings and issues, assigned to the Project lead, Structure, MEP and Drafting roles.
BET Armature handles the engineering for the Vertou school complex.

What you deal with

An AI that reads the project instead of making things up

  • A comment from the inspector

    It is noted with its date and the agreed reply; revising the drawings becomes a task for the Drafting role.

  • The architect is waiting for an answer

    Move the shaft or reinforce the slab? The assistant asks the project lead, with the consequences of each option.

  • A similar project, two years later

    Search finds the assumptions and choices of past projects, and the assistant reads them before suggesting anything.

Your spaces

One space per project, and lessons learned carried from one to the next

  • One space per project

    Assumptions, comments, replies and issues, with their dates.

  • Technical library

    Standard calculation reports and lessons learned from past projects.

  • Bids

    Tenders in progress and their deadlines.

Step by step

Running a design phase

  1. You create the space

    The project's space, and you invite the engineers and drafters.

  2. The phase becomes tasks

    Calculations, reports, drawings, issues: the assistant creates them and assigns each one to a role.

  3. Every request is traced

    Comments and requests are noted with their reply; revisions become tasks.

  4. The revision is documented

    When it is issued, the history is complete: who asked for what, when, and why.

FAQ

What people ask us

Does Tavimi replace our project management ERP?

No: no time tracking, no resource planning, no invoicing, no calculations. Tavimi keeps the technical memory of each project, alongside your ERP.

How do I stop ChatGPT or Claude from making up references?

No tool rules it out entirely. What helps: give the assistant the project's context and let it ask. In Tavimi, it reads the recorded assumptions and decisions, and asks on the task when information is missing.

What happens to the project when an engineer leaves?

It keeps its memory: assumptions, replies and comments stay in the space, under their name, and their tasks can be reassigned to someone else.

Prepare your next project with Tavimi

Sign up on your own, or ask for a guided pilot: a call to set up your spaces and first tasks with you.